|
|
| production line |
| |
Product introduction:
In recent years, “the project stone” is the aristocrat in building material products. It uses the crystallization mineral of natural quartz, natural marble debris, abandoned mine; common ore, river sand; disused glasswork, etc. and carries on the rogue depuration in the manufacture process, and the raw material is the heavy metal contain nothing may causing radiation, and the 90% mineral blend material and other resin, chemical additive , etc. accessory material. This kind of new upscale building material product, which is made trough high frequency mixed shaking and taken shape through ten thousand tons hydraulic pressure under the vacuum condition, is widely applies to ground and wall surface decoration of the guesthouse, the hotel, the public facility, the family housing, and applies equally to the fitment of kitchen floor, health bath floor, business place, etc. It market development prospect is bright.
Equipment introduction:
Bring in overseas advanced craft and equipment manufacture technology; mixing with “The Golden Milky Way” Mechanical Device Company’s abundant manufacture technology; satisfying the unique demand of mass stone factories, ceramic factories, and artificial stone factories, prosecuting Research & Development and practice; “pursuing super excellence and creating constantly”, we have successfully manufactured the unique “project stone production line” series specialized production equipment in the current world. Comparing to the expensive equipment surpasses several millions USD in overseas, “the project production line” in this company is practical in economy, reliable in quality, fist-class in manufacture. |

Click for large graphic |
High performance:
□The plate, which is made by “the project stone line”, is fine in quality, Enhances greatly in hardness degree, intensity and resistance. It conforms to the international examination standard. The plate surface color and the pattern is same with the nature marble.
□Compared to overseas equipment, the complete set of equipment is easier to operate, and can save nearly 95% money.
□This equipment produces end plate products’ rate is high, and can save raw material.
□This equipment produces single sheet plate using less resin quantity, and Accounts for the gross weight 8 - 12%.
□The demand of the project stone is huge in the domestic and foreign market. This set of production invests slightly, but the income is big, so it can take back the equipment investment quickly.
□The raw material massively uses quartzite, marble, abandoned mine, disused glasswork, etc. it conforms to the country to save the energy, the green environmental protection, etc. which have been given priority to development. It gives more advantage to investors, for the raw material market is rich, the supply is sufficient, and the cost is inexpensive.
□material market. By the year demand 300% speed growth. The project stone will substitute such kind of materials as nature stone, ceramic, artificial stone, plastic decoration, etc.
|

|

|
 |
 |
 |
 |

The project stone model |
|
| |
|
|